ILOFAR Groundworks Progress
In unseasonably favorable weather, the footprint for the latest LOFAR station (IE613) emerges from the ground at Birr Castle, Ireland. The ground levels are being raised by local contractors, Conneeley Building & Civil Engineering, to counter risks to the array posed by flooding.
Deployment of the antennas is scheduled to begin in spring 2017 after a pause for winter. IE613, when operational, will extend the international LOFAR base line to almost 1950km. Commissioning is expected to be completed in the autumn of 2017.